County Road 17

CR 17 Barrier Wall
Over 3.5 miles of Eagle Ready-Mix concrete barrier wall stretches from CR18 to CR26. This wall will help protect drivers traveling on the new CR 17.
CR 17 Bridge Substructure
This section contains in progress photos of the CR 17 bridge substructure. Eagle Ready-Mix is supplying all concrete for the substructure and bridge decks. In total, Eagle Ready-Mix will produce and supply over 10,000 cubic yards of concrete for the "Big Bridge" Project.
CR17 Bridge Deck
In 2004, Eagle Ready-Mix poured the 280' decks spanning over US Highway 33. In 2005, Eagle Ready-Mix will pour the the 760' decks crossing the Elkhart River and CR 45.

Upon the planned completion date of December 2005, Eagle Ready-Mix's concrete will allow thousands of vehicles per day to quickly travel over the Elkhart River, US Highway 33, CR45, and the Norfolk Southern railroad.

Hummer Plant

SUT Plant
The Hummer SUT (Sport Utility Truck) is manufactured on Eagle Ready-Mix concrete floors at the AM General plant in Mishawaka, Indiana.

Since the SUT is manufactured at the same production complex as the military HMMWV, in progress construction photos were not allowed.

Goshen Water Tower

Goshen Water Tower
Resting atop 84’ high, 15” thick Eagle Ready-Mix concrete walls, the Goshen water tower reaches a total height of 124’ and contains 1.5 million gallons of water.